混凝土搅拌车正确操作流程方法,你对了吗?
Are you right about the correct operation process of concrete mixer?
一、启动前应对机械系统各部位认真进行检查,确认良好后方可启动。
1、 Before starting, each part of the mechanical system shall be carefully checked and can be started only after it is confirmed to be in good condition.
二、启动前,应将搅拌操纵杆放在“空档”位置。
2、 Before starting, place the mixing control lever at the "neutral" position.
三、启动后,应将搅拌操纵杆放在“卸料”位置,放去筒内积水。
3、 After starting, place the mixing control lever at the "unloading" position to drain the accumulated water in the cylinder.
四、装料时,搅拌操作杆应放在“装料”位置。
4、 When loading, the mixing lever shall be placed at the "loading" position.
五、运输前,卸料槽须固定在“行驶”位置,防止摆动。
5、 Before transportation, the discharge chute must be fixed in the "driving" position to prevent swinging.
六、操作操纵杆时,应在“空档”位置稍作停留后方可动下一个位置。
6、 When operating the control lever, stay in the "neutral" position for a while before moving to the next position.
七、搞好文明施工,桶内多余材料不准随便乱倒。卸料后须对搅拌筒、料槽、托辊等部位进行清洗。
7、 Civilized construction shall be carried out. Excess materials in barrels shall not be dumped randomly. After unloading, the mixing drum, material trough, idler and other parts must be cleaned.
八、人进入筒内清理砼结块时,应将车辆熄火,拔下电门钥匙,筒外设人监护。
8、 When people enter the cylinder to clean up the concrete agglomeration, they should turn off the vehicle, pull out the switch key, and assign someone outside the cylinder for supervision.
搅拌车是一种特殊车辆,并不是所有会开车的司机都会开搅拌车,如果操作不当会引起翻车、液压泵、马达、减速机过快磨损或出现严重后果。
The mixer is a special vehicle. Not all drivers who can drive will drive the mixer. Improper operation will cause rollover, excessive wear of hydraulic pump, motor and reducer or serious consequences.
1.起动搅拌车之前,应把搅拌筒操作手柄放在“停止”位置。
1. Before starting the mixer, put the operating handle of the mixing drum at the "stop" position.
2.搅拌车起动发动机后,应使搅拌筒在低速下转动10分钟左右,使液压油温升到20℃以上后方可工作。
2. After starting the engine of the mixer truck, the mixing drum shall be rotated at low speed for about 10 minutes to make the hydraulic oil temperature rise to above 20 ℃ before operation.
3.搅拌车在露天停放时,装料前应将搅拌筒反转,将积水和杂物排出,以保持混凝土的质量。
3. When the mixer truck is parked in the open air, the mixing drum shall be reversed before loading to drain the accumulated water and sundries to maintain the quality of concrete.
4.搅拌车在运输混凝土时,要保持滑斗放置稳固,防止因松动造成摆动,在行进中打伤行人或影响其它车辆正常运行。
4. When transporting concrete, the mixer truck shall keep the sliding bucket firmly placed to prevent swinging due to looseness, hurting pedestrians or affecting the normal operation of other vehicles.
5.搅拌车装运搅拌好的混凝土时,搅拌筒转速为2-10转/分,在运输过程中,平坦路面上搅拌筒转速保持在2-3转/分,行驶在侧倾坡度大于50的路面,或左右晃动较大的路面时,应停止搅拌旋转,待路况好转后再恢复搅拌旋转。
5. When the mixer truck loads the mixed concrete, the rotating speed of the mixing drum is 2-10 rpm. During the transportation, the rotating speed of the mixing drum is kept at 2-3 rpm on the flat road. When driving on the road with a side slope greater than 50, or the road with a large shake from side to side, the mixing rotation shall be stopped, and the mixing rotation shall be resumed after the road conditions are improved.
6.混凝土搅拌车运送混凝土的时间不能过搅拌站规定的时间。运送混凝土途中,搅拌筒不得长时间停转,以防混凝土产生离析现象。司机应时常观察混凝土情况,发现异常及时通报调度室,申请做出处理。
6. The time for concrete mixer truck to transport concrete shall not exceed the time specified by the mixing station. During the transportation of concrete, the mixing drum shall not be stopped for a long time to prevent segregation of concrete. The driver shall always observe the concrete condition, report to the dispatching room in time in case of any abnormality, and apply for handling.
7.搅拌车车内装有混凝土时,在现场停滞时间不得过1小时,如超时应及时要求现场负责人给予及时处理。
7. When the mixer truck is loaded with concrete, the standstill time at the site shall not exceed 1 hour. If it exceeds the time limit, the person in charge of the site shall be required to deal with it in a timely manner.
8.搅拌车运送混凝土塌落度不得低于8cm。从混凝土入罐到排出,气温高时不得超过2小时须排出,阴雨天气温度低时,不得过2.5小时。
8. The slump of concrete transported by mixer truck shall not be less than 8cm. From the time of concrete entering the tank to discharging, it shall not exceed 2 hours when the temperature is high, and it shall not exceed 2.5 hours when the temperature is low in rainy weather.
9.搅拌车在排出混凝土之前,应使搅拌筒在10-12转/分的转速下转动1分钟,再进行排料。
9. Before the concrete is discharged from the mixer truck, the mixing drum shall be rotated for 1 minute at the speed of 10-12 rpm before discharging.
以上就是为大家介绍的有关
自动混凝土搅拌机的详细的介绍,希望对您有所帮助.如果您有什么疑问的话,欢迎联系我们.我们将以的态度,为您提供服务